Select Currency
Translate this page

CAUSES AND EFFECTS OF ABANDONED RESIDENTIAL PROPERTIES (A CASE STUDY OF BENIN CITY)

Format: MS WORD  |  Chapter: 1-5  |  Pages: 58  |  4726 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

CHAPTER ONE

INTRODUCTION

1.1     BACKGROUND TO THE STUDY

The unceasing abandonment of residential buildings and development projects is so shocking in the developing countries such that Nigerian has remained one of the countries in such difficulty (Ayodele and Alabi, 2011; Kotangora, 1993; Osemenan, 1987). Therefore, the significance that the incessant abandonment of residential buildings and projects would bring several effects on real properties and its values and the economy cannot be overemphasized since some of the abandoned buildings and development projects provide the basic services that should enhance the real properties developed. Abandoned residential building is a building whose occupant has moved out basically due to poor maintenance and infrastructure, security, dilapidation, natural disaster which has made the building not to be habitable. The abandonment of residential properties and development projects is the act of isolating the building or discontinuing any activities or maintenance works on such development project within a time frame of the contract agreement and with no intention of returning back to the development (Spelman, 1993). 

Similarly, O’Flaherty (1993) while reflecting on property development projects suggest that it is when an owner or developer is ceasing to provide the required maintenance management to a developed property. However, real property development and maintenance being a capital intensive undertaking should be critically analyzed to ascertain its feasibility and viability before embarking on it. But, on several occasions and as it had been observed, governments, contractors and agencies have abandoned old buildings and development projects mid-way into construction and completion. The causes and effects of these residential building abandonments are not just peculiar to a particular reason rather cut across several reasons (Ayodele and Alabi, 2011), and as well as creating a total dwindling effects on the values of developed properties located close and within the vicinity. Most of this abandoned residential building usually turned into hideout for criminals. Although, the location of the abandoned property and demand is equally important but accessibility and the availabilities of the infrastructures in the real property location and in the surrounding built environment should be of much more significant determinants in this study context. 

Values in itself are not intrinsic (Schram, 2012) rather depends on the benefits derivable from that property. While this remained the case for real properties, it is essential for any real property to have sustained improved values, and this is assumed to be influenced by the availability of the earlier mentioned infrastructures in the real property location. So, if the needed infrastructures are imperious in determining the property values. Benin City is the State Capital of Edo State, Nigeria is characterized with lots of abandoned residential building due to urbanization, poor infrastructures and roads. Residents of Benin City living in erosion prone areas have to pack out of their houses because of flooding and fear of reptiles. Some school buildings have been abandoned due to neglect by successive government which has turned into hideout for criminals and cultists.       

1.2     STATEMENT OF THE PROBLEM 

The causes and effects of abandonment of residential property has been a subject of concern for experts in real estate. Therefore, the study purpose is to investigate the causes and effects of abandoned residential property on real property and its values. The cogent of this study is on the premise that the expected real properties and its values in Nigeria are suspected to be dwindling as a result of incessant abandonment of residential properties. But, by exploring this context should help establish and recognize the causes and effects of abandonments of buildings by citizens, governments, policy/decision makers, educationalist and practitioners. This, through eradication of these causes should expect to eliminate these identified effects and sustain real properties and its values in the economy.

1.3     OBJECTIVES OF THE STUDY

The following are the objectives of this study: 
1.  To identify the causes of abandonment of residential properties in Benin City. 
2.  To examine the effects of abandonment of residential properties in Benin City. 
3.  To identify the solutions to issues of abandoned residential properties in Benin City.

1.4     RESEARCH QUESTIONS

1.     What are the causes of abandonment of residential properties in Benin City?

2.     What are the effects of abandonment of residential properties in Benin City?

3.     What are the solutions to issues of abandoned residential properties in Benin City?

1.6     SIGNIFICANCE OF THE STUDY

The results of this study will educate the general public on the causes and effect of abandonment of residential building in Nigeria with a view of reducing the issues of building abandonment in Nigeria. The outcome of this study will guide the government and policy makers on ways to make and implement policies that will reduce the rate of residential building abandonment in Nigeria. This research will also serve as a resource base to other scholars and researchers interested in carrying out further research in this field subsequently, if applied will go to an extent to provide new explanation to the topic.

1.7     SCOPE/LIMITATIONS OF THE STUDY 

This study on the causes and effect of abandoned residential properties in Benin City will cover all the cases on abandoned residential buildings in Benin City carefully examining the causes. It will also cover the consequences of the abandoned buildings in the affected area.

LIMITATION OF STUDY 

Financial constraint- Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).

Time constraint- The researcher will simultaneously engage in this study with other academic work. This consequently will cut down on the time devoted for the research work.

  DOWNLOAD THE COMPLETE PROJECT

CAUSES AND EFFECTS OF ABANDONED RESIDENTIAL PROPERTIES (A CASE STUDY OF BENIN CITY)

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON CAUSES AND EFFECTS OF ABANDONED RESIDENTIAL PROPERTIES (A CASE STUDY OF BENIN CITY) INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on CAUSES AND EFFECTS OF ABANDONED RESIDENTIAL PROPERTIES (A CASE STUDY OF BENIN CITY)?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on CAUSES AND EFFECTS OF ABANDONED RESIDENTIAL PROPERTIES (A CASE STUDY OF BENIN CITY)?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for CAUSES AND EFFECTS OF ABANDONED RESIDENTIAL PROPERTIES (A CASE STUDY OF BENIN CITY), What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!