Select Currency
Translate this page

EFFECTIVENESS OF DRAINAGE NETWORKS ON FLOODS

Format: MS WORD  |  Chapter: 1-5  |  Pages: 69  |  5720 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

EFFECTIVENESS OF DRAINAGE NETWORKS ON FLOODS

 

ABSTRACT

The study examined the effects of drainage networks on floods in Calabar metropolis, Nigeria. The rapid increase in urbanization without corresponding infrastructures in the city of Calabar has led to increased incidences of flood as the available drainage channels cannot contend with the volume of storm water. In view of this, the study established gauging stations for the measurement of drainage run off using measuring steel tape. And the volume of flood water was measured using stop watch method (Velocity of flow) and copies of questionnaire were administered to 400 households proportionally to the seven sample units. In view of the study objectives, it determine the relationship between drainage width and depth and floods. In addition, varied descriptive statistics tools were used to give a spot on assessment and understanding of the variables of interest. In view of the response of the gauging and physical measurement, it was established that Calabar experience heavy rainfall due to poor drainage facilities The result revealed that about 47% of the respondents said flood occur every year in their zone and 41.75% said it occurred most parts of the year. The frequency of flood is compounded with it’s intensity as over 59% of the sampled population agreed that flood of the sampled population agreed that flood intensity is very high in Calabar. The result further showed that the factors of flood occurrence in the study area is linked to heavy rainfall (26.3%), inadequate drainage channel (22%) poor physical planning (15.5%) among others. On the perceived causes of inadequate drainage channel, the result indicated that abuse of land use plans (28.7%) was a major factor followed by poor monitoring and evaluation of project (21.5%). the study also revealed that the drainage were very narrow and shallows as shown in frequent floods in the city. The incessant flood often leads to water inundating compounds (64.5%), preventing people from going out (11.25%), distortion of the scenic beauty of the environment (6.25%), landslide (4.75%). Based on these findings, the study recommended that since Calabar is located in a tropical zone characterized by heavy rainfall the government should take proactive measure to mitigate storm water. The present drainage systems should be cleared with shovel by the people on a regular basis to allow for a free flow of storm water. State department of town planning should live up to their bidding by ensuring total compliance to urban ordinance to forestall incessant floods and destruction of properties in the city of Calabar.

 

CHAPTER ONE

INTRODUCTION

1.1   BACKGROUND TO THE STUDY

Cities the world over are the dominating forces in the organization of human population. As the world most crowded places, cities continue to show increase in urban population. This increase leads to a growing urbanization trend. Duru and Nnaji (2008) defined urbanization as the increase in the population of cities in proportion to the region‟s rural population.

Urbanization is the outcome of social, economic and political developments that lead to concentration and growth of large cities, changes in land use and transformation from rural to metropolitan pattern of organization and governance. Rapid growth of towns and cities has been common feature of the developing world (Aderamo, 2008).

Although urbanization is the driving force for modernization, economic growth and development, there is increasing concern about the effects of expanding cities, principally on human health, livelihoods and the environment. The implications of rapid urbanization and demographic trends for employment, food security, water supply, shelter and sanitation, especially the disposal of wastes (solid and liquid) that the cities produce are staggering (United Nations Conference on Environment and Development, 1992).

The process of urbanization is believed to be connected with levels of development and some assert that, for a country to develop there is the need for an increased level of industrialization as it is generally accepted that there cannot be urbanization without rapid economic growth (Tettey, 2005). The pattern of urbanization in developing countries, particularly Africa, however, is creating some concern that it may be generating a lot of development problems in the process of its growth.

  DOWNLOAD THE COMPLETE PROJECT

EFFECTIVENESS OF DRAINAGE NETWORKS ON FLOODS

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON EFFECTIVENESS OF DRAINAGE NETWORKS ON FLOODS INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on EFFECTIVENESS OF DRAINAGE NETWORKS ON FLOODS?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on EFFECTIVENESS OF DRAINAGE NETWORKS ON FLOODS?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for EFFECTIVENESS OF DRAINAGE NETWORKS ON FLOODS, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!