Select Currency
Translate this page

MANAGEMENT OF PUBLIC DUMPSITE AND ITS EFFECT ON RESIDENTS

Format: MS WORD  |  Chapter: 1-5  |  Pages: 70  |  1485 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

MANAGEMENT OF PUBLIC DUMPSITE AND ITS EFFECT ON RESIDENTS

 

CHAPTER ONE

INTRODUCTION

1.1    BACKGROUND OF THE STUDY

The aggregate of health impact of poor waste management in developing countries remains a major issue of public health concern that demands urgent intervention by both governmental and non-governmental agencies with focus on health education designed at reducing environmental menace associated with waste management practices (Oghenekohwo and Akporehwe, 2015).A report by the National Orientation Agency (2011) indicates that Nigerian cities and towns are fast becoming what could be termed as “modern ghettos” because of the existence of heaps of refuse littering the streets. Cities and towns like Ibadan, Ijebu, Ota, Benin-City, Asaba, Lagos, Onitsha, Yenagoa and even in some parts of the Nation’s Federal Capital, Abuja is no exception. Waste management has emerged as one of the greatest challenges facing environmental protection agencies in Nigeria. The volume of solid waste generated continues to increase at a faster rate than the ability of the agencies to improve on the financial and technical resources needed to parallel its’ management in Nigeria cities as characterized by inefficient collection methods, insufficient coverage of the collection points and system and improper disposal of waste irrespective of the types (Agunwamb, Egbuniwe, and Ogwueleka, 2003).

Most developing countries, Nigeria inclusive, have solid waste management problems that are different from those found in industrialized countries in terms of composition, density, political will and economic framework aimed at financing its management. Besides, the wastes are heavier, wetter and more corrosive in developing cities than developed cities (Aigbokhavbo 2000; Akinwale, 2005). As at present, most urban communities are grappling with the forces of climate change that have engendered heavy rain falls, massive erosion, flooding among other environmental damaging consequences. It is also evident that communities are greatly overwhelmed by the attendant effects of health related issues as a result of the pollutions brought about by various waste materials that are poorly channeled and situated in communities. All these compromise the variants of community development, which Cary (1970), hypothesized in different context with environmental related issues. Accordingly, community development is always a process and will remain a process which in the view of Cary (1970), is about developing the power, skills, knowledge and experience of people as individuals and in groups, thus, enabling them to undertake initiatives of their own to combat social, economic, political and “environmental problems”, thereby enabling them to fully participate in a truly democratic process. In this context, the writer specified environmental problems, part of which is waste management. Therefore, a holistic community development process must take a lead in countering the destruction of the natural environment on which all depend.

Meanwhile, it has been underscored by Oghenekohwo (2012) that community development seeks to enable individuals and communities to grow and change according to their own needs and priorities, and at their own pace, provided this does not oppress other groups and communities, or damages the environment. Thus, the process of community development is associated with ensuring healthy environment that is devoid of pollution; (air; water, earth etc.), but enhances community health practices as a major concern in waste management. Therefore, it is within the expectation of promoting community health that the variants of waste management draws on community development in practice.

1.2            STATEMENT OF THE PROBLEM

The campaign against environmental decay is therefore seen as a collective responsibility of both the public and private sector. Against this backdrop, the various stakeholders needed to be more informed about the need for proper environmental care. This campaign becomes eminent as the morbidity and mortality that results from such indiscriminate waste management practices continues to hunt the people against the backdrop of development. (National Orientation Agency, 2011). Urban solid waste management incorporates several interrelated aspects, which needs complete cooperation and collaboration of the community for efficient delivery. It comprises aspects of waste generation, waste composition, collection, recycling (if any), pretreatment and treatment, and finally disposal (Periathamby, 2011). These management aspects thus require input from legal, economic, governmental, political, administrative, and environmental actors. Thus, it requires the involvement of multi-professional drivers such as community change agents among others.

1.3     RESEARCH QUESTIONS

The pertinent questions to this research work are:

1.     How has the residents in high court area been disposing their refuse?

2.     Is the method of refuse disposal the best way to dispose waste?

3.     Has the local government looked into the management of Kurata dumpsite?

4.     What is the health implication of Kurata dumpsite on the residents in this environment?

1.4       AIMS AND OBJECTIVE OF STUDY

The aim of this studies is to critically study about the management of Kurata public dump sites and its effect on the residents in the environment. The objectives are:

1.     To examine how the residents in high court area have been disposing their refuse.

2.     To ascertain if the method of refuse disposal used by the residents is the best way to dispose waste.

3.     To ascertain if the local government has looked into the management of Kurata dumpsite.

4.     To study the health implication of Kurata dumpsite on the residents in this environment.

1.5     RESEARCH HYPOTHESIS

The dumpsite at Kurata, off High court road, Ota does not have any health implication on the residents of its environs.

 The dumpsite at Kurata, off High court road, Ota does not have any health implication on the residents

  DOWNLOAD THE COMPLETE PROJECT

MANAGEMENT OF PUBLIC DUMPSITE AND ITS EFFECT ON RESIDENTS

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON MANAGEMENT OF PUBLIC DUMPSITE AND ITS EFFECT ON RESIDENTS INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on MANAGEMENT OF PUBLIC DUMPSITE AND ITS EFFECT ON RESIDENTS?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on MANAGEMENT OF PUBLIC DUMPSITE AND ITS EFFECT ON RESIDENTS?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for MANAGEMENT OF PUBLIC DUMPSITE AND ITS EFFECT ON RESIDENTS, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!