Select Currency
Translate this page

EFFECT OF BUILDING MATERIAL COST ON HOUSING DEVELOPMENT IN NIGERIA

Format: MS WORD  |  Chapter: 1-5  |  Pages: 62  |  11901 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

EFFECT OF BUILDING MATERIAL COST ON HOUSING DEVELOPMENT IN NIGERIA

 

CHAPTER ONE 

INTRODUCTION 

1.1   BACKGROUND TO THE STUDY 

Researchers in building sector have indicated that between 50 to 60 per cent of the total construction input goes into building materials. As a result, there is an urgent need to address the high cost of these products which is said to have slowed down the growth of the building and construction sector in Nigeria. Building materials constitute the largest single input in housing construction. While Adedeji (2010) observed that about sixty (60) per cent of the total housing expenditure goes for the purchase of building materials, Arayela (2015) averred that the cost of building materials constitutes about 65 percent of the construction cost.

Ogunsemi (2010) opined that building materials form the main factors that restricts the supply of housing and ascertained that they account for between 50-60 percent of the cost of buildings. Thus, Adedeji (2012) rightly observed that one main barrier to the realization of effective housing in Nigeria as revealed in successive government efforts has been the cost of housing in the country. He argued that in the early periods, shelter in Nigeria was easily affordable as building materials were sourced from the immediate environment at affordable costs. Technology also was readily available with commensurate simple techniques. But contact with the outside world through interregional and international training of professionals in foreign countries as occasioned by colonization, brought changes to tastes and hence outlook to house forms. These changes rendered the undeveloped local building materials inadequate while there was an increased demand for exotic ones.

Accordingly, Arayela (2012) posited that the modern building industry lays much emphasis on sophisticated building materials and techniques that are expensive and energy consuming. Though, housing delivery efforts have evidently been inhibited by prohibitive costs of building materials, this problem cannot be reasonably and reliably overcome by merely resorting to the use of locally available materials without due considerations to the applicable initiative, the cost of processing and sustainability of the local materials. One of the most important components of a sustainable building is the material efficiency.  Correct selection of building materials can be performed by taking into account their complete life span and by choosing products with the minimal environmental impacts. For instance, González and Navarro (2016) estimated that the selection of building materials with low environmental impacts can reduce carbon dioxide (CO2) emissions by up to 30%. The use of renewable and recycled sources is widely encouraged as the life-cycle of a building and its elements can be closed (Chwieduk, 2013). 

The major factor that greatly affect the selection of building materials are their costs and social requirements such as thermal comfort, good mechanical properties (strength and durability), aesthetic characteristics and an ability to construct quickly. Ideally, the combination of all environmental, economic and social factors can give a clear description of a material, and thus helps in a decision making process regarding the cost of the materials suitable for buildings (Abeysundara, et, al.,2015).

Nigerians would continue to pay more for accommodation in major cities until the cost of building materials is subsidized through probably through tax reduction. The instability in the price of building materials was posited as a direct result of high taxes which in turn impacts on the cost of accommodation in major cities across the country. According to Arayela (2012), many completed housing estates had remained unoccupied because of the high rental and sale prices attached to them as against the meager income of the average Nigerian workers. He also added that if government can revitalise our industrial base, the cost of building materials will come down and many more people would be able to build houses. He therefore urged the Federal Government to provide tax relief for local manufacturers and importers of building materials in order to reduce the high cost of accommodation in major cities. 

1.2   STATEMENT OF THE PROBLEM 

Building materials have been playing an important role in the construction industry they are those materials put together in erecting or constructing structures, no field of engineering is conceivable without their use (Akanni, 2016; Udosen & Akanni, 2010). Building materials contribute immensely to the quality and cost of housing, from what is used in the foundation to the materials for roofing and finishes, while the building materials industry is an important contributor to the national economy of any nation as its output governs both the rate and the quality of construction work. 

The cost of building materials poses a significant threat to both the construction industry and people aspiring to own houses (Anosike, 2015; Mekson, 2014; Mohammed, 2014;Njoku, 2017); for example, a bag of cement, which is valued at Ν1,350.00 in 2006, goes as high as Ν1,850.00 in 2015(Anosike, 2015) depicting about 37% increment; the bag goes as high as Ν2,000.00 in 2015 during peak season (field survey 2015). Supporting this view, Jagboro and Owoeye (2014) earlier established that increase in the prices of building materials has multiplier effects on housing development while Idoro and Jolaiya (2010) affirmed that many projects were not completed on time due to the cost of materials, which have been on the increase. 

Besides timely completion, high prices of building materials form a crucial constraint to improving housing conditions in Nigeria (United Nations Centre forHuman Settlement [UNCHS], 2013). In spite of the past studies on the cost of building materialsin Nigeria, little is publicized about the implications ofthe rise in cost on the construction industry; most literature (Jagboro&Owoeye, 2014; Mekson, 2014; Njoku, 2017; Oladipo & Oni, 2012) has concentrated on identifying thecauses with little emphasis on the implications; hence, theresearch seeks to provide information on the effect of cost of building materials on housing development in Nigeria. 

1.3   OBJECTIVES OF THE STUDY 

The following are the objectives of this study: 

1.  To examine the effect of building materials cost on housing development in Nigeria. 

2.  To determine the factors responsible for high cost of building materials in Nigeria. 

3.  To proffer solutions that will reduce the cost of building material to ensure adequate housing development in Nigeria. 

1.4   RESEARCH QUESTIONS 

1.  What is the effect of building materials cost on housing development in Nigeria? 

2.  What are the factors responsible for high cost of building materials in Nigeria? 

3.  What are the solutions that can reduce the cost of building material to ensure adequate housing development in Nigeria? 

1.5   RESEARCH HYPOTHESIS 

Ho: Cost of building materials does not affect housing development in Nigeria.

Hi: Cost of building materials does affect housing development in Nigeria. 

1.6   SIGNIFICANCE OF THE STUDY 

The following are the significance of this study: 

1.  Findings from this study will educate the general public on the current market cost of building materials in Nigeria and its effect on sustainable housing development in Nigeria. 

2.  The results of this study will sensitize the policy makers and the government on the need to make and implement policies that will reduce the cost of building materials in Nigeria thereby encouraging massive housing development all over the country. 

3.  This research will also serve as a resource base to other scholars and researchers interested in carrying out further research in this field subsequently, if applied will go to an extent to provide new explanation to the topic. 

1.7   SCOPE/LIMITATIONS OF THE STUDY 

This study on the effect of building materials cost on housing development in Nigeria will cover the current prices of building material in Nigeria focusing on how it has influenced the provision of affordable housing for the Nigerian populace. 

LIMITATION OF STUDY 

Financial constraint- Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview). 

Time constraint- The researcher will simultaneously engage in this study with other academic work. This consequently will cut down on the time devoted for the research work.

  DOWNLOAD THE COMPLETE PROJECT

EFFECT OF BUILDING MATERIAL COST ON HOUSING DEVELOPMENT IN NIGERIA

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON EFFECT OF BUILDING MATERIAL COST ON HOUSING DEVELOPMENT IN NIGERIA INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on EFFECT OF BUILDING MATERIAL COST ON HOUSING DEVELOPMENT IN NIGERIA?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on EFFECT OF BUILDING MATERIAL COST ON HOUSING DEVELOPMENT IN NIGERIA?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for EFFECT OF BUILDING MATERIAL COST ON HOUSING DEVELOPMENT IN NIGERIA, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!