Select Currency
Translate this page

A REVIEW OF THE RHEOLOGICAL EFFECTS OF POWER LAW DRILLING FLUIDS ON CUTTINGS TRANSPORTATION IN NON-VERTICAL BOREHOLES

Format: MS WORD  |  Chapter: 1-5  |  Pages: 75  |  3140 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

A REVIEW OF THE RHEOLOGICAL EFFECTS OF POWER LAW DRILLING FLUIDS ON CUTTINGS TRANSPORTATION IN NON-VERTICAL BOREHOLES

 

ABSTRACT

Cuttings transportation during in non-vertical boreholes is necessary for oil and gas wells. Adequate cuttings removal from a well in drilling is critical for cost-effective drilling as high annular cuttings buildup often leads to high risk of stuck pipe, reduced rate of penetration and other impediments to standard drilling and completion procedures. This study investigates how rheological parameters influence the removal of cuttings in non-vertical boreholes. It contributes to work already done to ensure efficient hole cleaning process. In this study, the rheological parameters examined were the flow index (n), consistency index (K), plastic viscosity (PV), mud yield point (YP), YP/PV ratio, apparent viscosity and effective viscosity. Fifteen mud samples, three annular velocities (3.82, 2.86 and 1.91 ft/sec) and three hole angles (30o, 45o and 70o) were considered. An Excel Spreadsheets program was used to determine the parameters. The results of this study show that, higher annular mud velocities are required for efficient hole cleaning in directional wells than in vertical wells. Increasing values of YP, YP/PV ratio and K promote effective cuttings transport while the value of n should be low. Effective and apparent viscosities also should be high.

 

CHAPTER ONE

INTRODUCTION

1.1  Problem Definition

Many materials of engineering interest must be handled and transported as slurries or suspensions of insoluble particulate matter. Transportation of cuttings in non-vertical boreholes is of no exception. Almost the same thing occurs whereby the cuttings act as the solids in the drilling fluid. In spite of the many technological advances that have accompanied the drilling of non-vertical boreholes, one significant remaining challenge is effective cuttings transport, particularly in deviated wells. The transportation of cuttings during drilling has a major influence on the economics of the drilling process. Problems that can occur as a result of inefficient hole cleaning from cuttings include reduced weight on bit, increase risk of pipe stuck and inability to attain the desired reach, reduced rate of penetration (ROP), extra cost because of the need of special additives in the drilling fluid, extra pipe wear, transient hole blockage which can lead to lost circulation and wasted time for wiper tripping. These problems have prompted significant research into cuttings transport during the past 50 years. (Kelessidis, 2004).

Hole cleaning relying on viscous fluids in laminar flow for drilling has proved to be inefficient because of the inability to rotate the string to agitate bedded cuttings. Alternatively, a high fluid flow to induce turbulent flow regime is more effective for hole cleaning, but difficult to achieve because of high friction pressures in the drillpipe. Therefore a bed of cuttings is almost always present in non-vertical boreholes. For laminar flow, the distance that a particle will travel (downstream) before it falls across the annulus clearance can be calculated using Stokes’ law and the local viscosity while flowing can also be calculated. This analysis may be easily applied to optimize mud selection and wiper trips. Applying this model to high low-shear rate-viscosity (LSRV) gels shows that they may perform well inside casing but are expected to do a poor job of hole cleaning in a narrow openhole horizontal annulus without rotation.

For turbulent flow in horizontal wells, the concept of using annular velocity (AV) as a measure of hole cleaning is insufficient. A more complete term called AVRD is introduced, which is the product of the AV and the square root of the hydraulic diameter. This term can be used to compare cuttings transport in turbulent flow in horizontal wells of different cross sectional areas. (Leising et al., 1998). Rheology which is the study of the flow and deformation of fluids is an important contributing factor to these problems. Rheology describes the relationships between shear rate and shear stress. Pilehvari, Azar, and Sanchez2,16 state that fluid velocities should be maximized to achieve turbulent flow, and mud rheology should be optimized to enhance turbulence in inclined/horizontal sections of the well bore. The purpose of this study is to investigate how rheological parameters influence the removal of cuttings in non-vertical boreholes.

1.2  Objectives

The objectives of this research are:

· To present a review of cuttings transport in vertical, directional/horizontal well bores.

· To provide a critical review of how rheology affects cuttings transportation in non-vertical boreholes.

· To identify the critical parameters that affect effective removal of cuttings in the drilling of non-vertical boreholes.

· To propose a methodology for analysing the rheological parameters that affect cuttings transportation in non-vertical boreholes.

  DOWNLOAD THE COMPLETE PROJECT

A REVIEW OF THE RHEOLOGICAL EFFECTS OF POWER LAW DRILLING FLUIDS ON CUTTINGS TRANSPORTATION IN NON-VERTICAL BOREHOLES

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON A REVIEW OF THE RHEOLOGICAL EFFECTS OF POWER LAW DRILLING FLUIDS ON CUTTINGS TRANSPORTATION IN NON-VERTICAL BOREHOLES INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on A REVIEW OF THE RHEOLOGICAL EFFECTS OF POWER LAW DRILLING FLUIDS ON CUTTINGS TRANSPORTATION IN NON-VERTICAL BOREHOLES?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on A REVIEW OF THE RHEOLOGICAL EFFECTS OF POWER LAW DRILLING FLUIDS ON CUTTINGS TRANSPORTATION IN NON-VERTICAL BOREHOLES?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for A REVIEW OF THE RHEOLOGICAL EFFECTS OF POWER LAW DRILLING FLUIDS ON CUTTINGS TRANSPORTATION IN NON-VERTICAL BOREHOLES, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!