Select Currency
Translate this page

DEVELOPMENT OF NODAL ANALYSIS FOR PRODUCTION OPTIMIZATION: A SOFTWARE ASSISTED APPROACH

Format: MS WORD  |  Chapter: 1-5  |  Pages: 76  |  5071 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

CHAPTER ONE

INTRODUCTION

1.1  Background to study

Nodal analysis also known as “system analysis” is a systematic procedure/approach applied to the enhancement or optimization of production of oil and gas wells by analyzing and evaluating the complete production system. Every component that constitutes the production system can be optimized to achieve the objective production (flow) rate most economically. The production system comprises of flow of hydrocarbon fluids from the reservoir to the surface production facilities, and including inflow performance, as well as flow across the completion, up the tubing string (including any down hole restrictions and safety valves) across the surface choke (if applicable), through horizontal flow-lines. The production system can be relatively simple or can include many components in which energy or pressure losses occur (fig, 1-1). Any production well is drilled and completed to move the oil or gas from its original location in the reservoir to the stock tank or sales line (for gas). Movement or transport of these fluids requires energy to overcome friction losses in the system and to lift the products to the surface. 

The fluids must travel through the reservoir and the piping system and ultimately flow into a separator for gas liquid separation. The pressure drop in the total system at any time will be the static initial fluid pressure minus the final fluid pressure, PR-Psep. This pressure drop is the sum of the pressure drops occurring in all of the components of the system (fig 1.2). Since the pressure drop through any component varies with producing rate, the producing rate will be controlled by the components selected. The selection and sizing of the individual components is very important, but because of the interaction among the components, a change in the pressure drop in one may change the pressure drop behavior in all the others. This occurs because the flowing fluid is compressible, and, therefore, the pressure drop in a particular component depends not only on the flow rate through the component, but also on the average pressure that exists in the component.  

The final design of a production system cannot be separated into reservoir performance and piping system performance and handled independently. The amount of oil and gas flowing into the well from the reservoir depends on the pressure drop in the piping system, and the pressure drop in the piping system depends on the amount of fluid flowing through it. Therefore, the entire production system must be analyzed as a unit.    The production rate or deliverability of a well can often be severely restricted by the performance of only one component in the system. If the effect of each component on the total system performance can be isolated, the system performance can be optimized in the most economical way.

1.2       STATEMENT OF RESEARCH PROBLEM

There are numerous oil and gas wells around the world that have not been optimized to achieve an objective rate efficiently. Past experience has shown that large amounts of money have been wasted on stimulating the formation when the well's producing capacity was actually being restricted because the tubing or flow line size was too small. Another example of errors in completion design is to install tubing that is too large. This often happens on wells that are expected to produce at high rates. It has been shown that this practice not only wastes money on oversized equipment, but tubing that is too large can actually reduce the rate at which a well will flow. Thus can cause the well to load up with liquids and die, which necessitate; the early installation of artificial lift equipment. In fact, many wells may have been completed in such a manner that their maximum potential rate cannot be achieved.  

1.3     OBJECTIVE OF STUDY

The objectives of nodal analysis are as follows.

a. To determine the flow rate at which the existing oil or gas well will produce considering well bore geometry and completion limitations (by natural flow).

b. To optimize the system to produce the objective flow rate most economically.

c. To check each component in the well system to determine whether it is restricting the flow rate unnecessarily.

d. To permit quick recognition by the operator's management and engineering staff of ways to increase production rates.  

1.4   SIGNIFICANCE OF STUDY

Nodal analysis is a great tool for production optimization; its effects to the oil and gas industry are vast and include the following:

a. Quick estimate of flow rate, and as such reduction in time taken to do this.

b. Alternative method for the prediction of flow rate.

c. Identify the reservoir and well parameter that affect the flow rate the most and as such will aid engineers to concentrate on these factors when sourcing for data and when performing PROSPER run. One of the most important aspects of nodal analysis is to recognize wells that should be producing at rates higher than their current rate. Therefore, it can serve as an excellent tool to verify that a problem exists and that additional testing is necessary. Nodal analysis can determine which component is restricting the rate or can determine that incorrect data are the cause of the higher predicted rate.  

1.5   SCOPE AND LIMITATION OF STUDY

This study is intended to cover the following areas

a. System Analysis Approach

b. Nodal Concept

c. Inflow Performance Relationships

d. Well Design

e. Theory of the Reservoir flow

f.  Flow Restrictions

g. Completion Effects

h. Multiphase flow

i.  Use of Computer software Program (PROSPER) for Complex Solution.
Some limitations encountered in the course of this study are:

a. Access to accurate data

b. Time constraint

c. Breech on internet access due to poor network

d. Power  

1.6    PROJECT MATERIALS

a. Production optimization text books, journals and papers

b. PROSPER software

c. Well/reservoir data Recent projects on nodal analysis ( for reference purposes)

  DOWNLOAD THE COMPLETE PROJECT

DEVELOPMENT OF NODAL ANALYSIS FOR PRODUCTION OPTIMIZATION: A SOFTWARE ASSISTED APPROACH

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DEVELOPMENT OF NODAL ANALYSIS FOR PRODUCTION OPTIMIZATION: A SOFTWARE ASSISTED APPROACH INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DEVELOPMENT OF NODAL ANALYSIS FOR PRODUCTION OPTIMIZATION: A SOFTWARE ASSISTED APPROACH?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DEVELOPMENT OF NODAL ANALYSIS FOR PRODUCTION OPTIMIZATION: A SOFTWARE ASSISTED APPROACH?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DEVELOPMENT OF NODAL ANALYSIS FOR PRODUCTION OPTIMIZATION: A SOFTWARE ASSISTED APPROACH, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!