Select Currency
Translate this page

TEMPERATURE AND WATER REQUIREMENT FOR LEACHING OF CAUSTIC ALKALI FROM ‘NGU’

Format: MS WORD  |  Chapter: 1-5  |  Pages: 56  |  2861 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

TEMPERATURE AND WATER REQUIREMENT FOR LEACHING OF CAUSTIC ALKALI FROM ‘NGU’

 

ABSTRACT

The production and analysis of “Ngu” extract for temperature and water requirement for leaching of casuistic alkali is the basic objective of this project.  The production was carried out by using unit operations and also using the female inflorescence of a palm fruit (Eleasis Guineesis) as raw material. The female inflorescence of palm fruit was size reduced from original dimensions to maintain particle size characteristics. The size reduced bunches were dried at room temperature and at normal atmospheric pressure; after which the sized reduced bunches were burnt at higher temperature.  The cooled ashes were dissolved, filtered by using a sieve of mesh size and the filtered solution is the “Ngu” extract. The pineapple content of the alkali leached from Ngu ash was potassium hydroxide. Material and energy balances, equipment sizing with recommended material of construction, costing and profitability analysis was done.  It should however, be noted that a profitable project could be embarked upon if the equipments to be fabricated locally which also reduce foreign exchange being extended on the importation of potassium hydroxide.

 

CHAPTER ONE

INTRODUCTION

Temperature and water requirement for leaching of caustic alkali from Ngu refers to the extraction of a soluble constituent from a solid by means of a solvent.  The process may be employed either for the production of a concentrated solution of a valuable solid material, or in order to free an insoluble solid from a soluble material with which it is contaminated. The method used for the extraction will be determined by the proportion of soluble constituent present, its distribution throughout the solid, the nature of the solid and the partied size.  The main constituent is usually potassium oxide which often comprises nearly 50% of the total weight of ash.

In this project, the major parameters that must be fixed or identified among other are the solvent used, the temperature and the leaching cycle.  The main objective of this research was therefore to identify the suitable temperature and solvent (water) quantity required to give optimum result when alkali, taken as koH, is to be leached from Ngu ash.

IMPORTANCE OF POTASSIUM HYDROXIDE

The need for chemical raw materials for most chemical industries has been on the increase, following the increase in the world population and man’s need for their products.  These chemicals includes those used for diverse production such as production of soap, candle, margarine, plastics and other products.

The chemical raw materials includes sodium hydroxide (HaoH), potassium hydroxide (koH), calcium hydroxide (CaCoH2), sodium hydrogen trioxocarbonate (iv) among others, industrially, these chemicals are manufactured from various sources and through diverse chemical processes and reactions. These processes and reactions which these chemicals are produced are usually complex and requires a high cost of production. As a result of this production, the prices of the chemicals are not affordable for the average production Engineer and as a result necessities of life as well as the ways of handling or producing them, the chemical engineer whose goal is to mocimize profit and save cost is now faced with many challenges.

The “Ngu” is locally obtained from the female palm inflorescence of oil palm tree. The large inflorescence (female) consists of a branched perides of  numerous, unisexual regular flowers.  The panicles which is subtended by a woody branch as sometimes referred to as the spadic. Usually the flowering occurs set the beginning of the dry season.

The “Ngu” as a source of chemical raw materials has not really gained an international recognition as a major source of alkali, as well be discovered I this analysis.  But we are determined to put in our best in this research work with a view to unfolding all the desirable benefits with from Ngu extract, it is true that the uses of Ngu extract for soap production dated back to our forefathers but it was clear that they did not know what they were doing.  Moreover the production processes were very crude obviously resulting to be very poor quality product.

Hydroxide of potassium is used in the production of detergents and miscellaneous chemicals which found use in laboratory and industries. Potassium salts are used in the preparation of fertilizer which makes it essential to plant and animal life.  It is also used in production of glass, gunpowder, and fireworks.

OBJECTIVE OF THE PRODUCT

The basic objective of this project is to produce and analysis the “Ngu” solution obtained from palm oil tree with reference to temperature and water requirements. This analysis involves forms of elements contained in Ngu via the female in florescence. This is done by carrying out quantities and qualitative analysis on the Ngu extract as contained in this project report.

  DOWNLOAD THE COMPLETE PROJECT

TEMPERATURE AND WATER REQUIREMENT FOR LEACHING OF CAUSTIC ALKALI FROM ‘NGU’

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON TEMPERATURE AND WATER REQUIREMENT FOR LEACHING OF CAUSTIC ALKALI FROM ‘NGU’ INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on TEMPERATURE AND WATER REQUIREMENT FOR LEACHING OF CAUSTIC ALKALI FROM ‘NGU’?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on TEMPERATURE AND WATER REQUIREMENT FOR LEACHING OF CAUSTIC ALKALI FROM ‘NGU’?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for TEMPERATURE AND WATER REQUIREMENT FOR LEACHING OF CAUSTIC ALKALI FROM ‘NGU’, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!